SCOPE OF THE WORK

Run of the River hydro project for Dzawada’enuxw First Nation.

  • Installation of concrete intake and weir structure.
  • Reactivation and construction of approximately 2.2km of access road, with geotechnically stabilized retaining walls
  • Installation of approximately 1,300m of 500mm HDPE Penstock
  • Construction of powerhouse and tailrace discharge structure. Including blasting, excavation, concrete pouring, installation of CLT timber powerhouse superstructure and 5 tonne overhead gantry crane.
  • Installation of mechanical equipment including 350 KW turbine-generator and ancillary equipment.
`