PROJECT DETAILS

PROJECT TYPE
Hydroelectric Projects
REGION/LOCATION
Squamish, BC
START DATE
June 2022
COMPLETION DATE
June 2022

SCOPE OF THE WORK

Recoating the existing steel access adit door to the power tunnel of the Cheakamus Water Passage which runs 10.8km feeding 2 x 2.7m diameter penstocks. The door is located ~ 220m from the surface access portal near the Shadow Lake intake structure.

`