PROJECT TYPE
Hydroelectric Projects
REGION/LOCATION
Gold Bridge, BC
START DATE
June 2012
COMPLETION DATE
November 2013
SCOPE OF THE WORK
- Construction of 2 Concrete Intake Structures
- Forming, batching, and pouring of reinforced concrete –650 m3
- Supply and installation of misc. metals: platform grating, handrails, slide gates, etc.
- Installation of Obermeyer inflatable weir
- Multiple creek diversions for staged construction
- Design, supply and installation of 70ft steel portable bridge
- Drilling and grouting of rock dowels
- Erosion and sediment control
- Supply and Installation of Penstock – 2,156 m total length
- Supply and Installation of 48” HDPE Pipe – 1,161 m
- Supply and Installation of 63” HDPE Pipe – 612 lm
- Supply and Installation of 57” Ductile Pipe – 1,133 lm
- Supply and Installation of 54” Welded Steel Pipe – 750 lm
- Drilling and blasting of rock
- Supply and Installation 2 @ 60ft permanent bridges
- Construction and maintenance of haul roads
- Construction of Powerhouse Foundation and Superstructure
- Forming, batching, and pouring of reinforced concrete –700 m3
- Supply and installation of prefabricated steel building
- Supply and installation of 30T overhead crane
- Construction of concrete foundations for switchyard
`