PROJECT DETAILS

PROJECT TYPE
Hydroelectric Projects
REGION/LOCATION
Gold Bridge, BC
START DATE
June 2012
COMPLETION DATE
November 2013

SCOPE OF THE WORK

  • Construction of 2 Concrete Intake Structures
  • Forming, batching, and pouring of reinforced concrete –650 m3
  • Supply and installation of misc. metals: platform grating, handrails, slide gates, etc.
  • Installation of Obermeyer inflatable weir
  • Multiple creek diversions for staged construction
  • Design, supply and installation of 70ft steel portable bridge
  • Drilling and grouting of rock dowels
  • Erosion and sediment control
  • Supply and Installation of Penstock – 2,156 m total length
  • Supply and Installation of 48” HDPE Pipe – 1,161 m
  • Supply and Installation of 63” HDPE Pipe – 612 lm
  • Supply and Installation of 57” Ductile Pipe – 1,133 lm
  • Supply and Installation of 54” Welded Steel Pipe – 750 lm
  • Drilling and blasting of rock
  • Supply and Installation 2 @ 60ft permanent bridges
  • Construction and maintenance of haul roads
  • Construction of Powerhouse Foundation and Superstructure
  • Forming, batching, and pouring of reinforced concrete –700 m3
  • Supply and installation of prefabricated steel building
  • Supply and installation of 30T overhead crane
  • Construction of concrete foundations for switchyard
`