SCOPE OF THE WORK
General Contractor for construction of a 6 MW hydroelectric project that included the construction of:
- Concrete intake and weir structure c/w Coanda screen and gates.
- Powerhouse and switchyard concrete foundations and miscellaneous metals.
- 900 mm dia. steel penstock (3.1 km) and 1,070 mm dia. HDPE penstock (0.5 km), including three major buried creek crossings, two of them at waterfalls.