Two phased construction of a 4 lane roadway including 18 m long bridge over the Millstone River complete with pre-cast concrete box girders, cast-in-situ concrete abutments, steel railings and hangers for suspension of utilities
Demolition and removal of existing bridge structure
MSE Wall Construction
Reconfiguration of 2 intersections complete with temporary and new intersection signalization and lighting – Bowen Road at Pryde Avenue and Bowen Road at Buttertubs
Traffic control and establishment of detours to accommodate traffic flow of approximately 16,000 vehicles per day through construction site
Construction of new roads and reconstruction of existing roads complete with new concrete curbs, sidewalks, asphalt paving and signage
Supply and installation of new underground infrastructure (i.e. water, storm and sanitary sewers, electrical, etc.) requiring extensive shoring of deep excavations and by-pass pumping of live sewage