PROJECT TYPE
Hydroelectric Projects
REGION/LOCATION
Tahsis, BC
START DATE
May 2011
COMPLETION DATE
November 2011
SCOPE OF THE WORK
- Construction of Concrete Intake and Weir Structures
- Forming, batching, and pouring of reinforced concrete – 393 m3
- Supply and installation of misc. metals: platform grating, handrails, slide gates, etc.
- Installation of Obermeyer weir
- Multiple creek diversions for staged weir construction
- Drilling and grouting of rock dowels
- Erosion and sediment control
- Supply and Installation of Penstock – 2,156 m total length
- Supply and Installation of 54” HDPE Pipe – 688 lm
- Supply and Installation of 48” HDPE Pipe – 277 lm
- Supply and Installation of 44.5” Ductile Iron Pipe – 1,191 lm
- Trench rock removal– 1,352 lm
- Supply and Installation of a 27 m span pipe bridge
`