PROJECT DETAILS
PROJECT TYPE
Hydroelectric Projects
REGION/LOCATION
Tahsis, BC
START DATE
May 2011
COMPLETION DATE
November 2011
SCOPE OF THE WORK
Construction of Concrete Intake and Weir Structures
Forming, batching, and pouring of reinforced concrete – 393 m3
Supply and installation of misc. metals: platform grating, handrails, slide gates, etc.
Installation of Obermeyer weir
Multiple creek diversions for staged weir construction
Drilling and grouting of rock dowels
Erosion and sediment control
Supply and Installation of Penstock – 2,156 m total length
Supply and Installation of 54” HDPE Pipe – 688 lm
Supply and Installation of 48” HDPE Pipe – 277 lm
Supply and Installation of 44.5” Ductile Iron Pipe – 1,191 lm
Trench rock removal– 1,352 lm
Supply and Installation of a 27 m span pipe bridge